Installing the bbwc battery, Pack or the fbwc capacitor pack – HP ProLiant ML370 G6 Server User Manual
Page 86
![background image](/manuals/397642/86/background.png)
Hardware options installation 86
6.
Install the cache module.
7.
Install the access panel.
8.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
9.
Powering up and configuring the server
" on page
Installing the BBWC battery pack or the FBWC capacitor pack
CAUTION:
Do not use this controller with cache modules designed for other controller models,
because the controller can malfunction and you can lose data. Also, do not transfer this cache
module to a different controller module, because you can lose data.
To install the component:
1.
Back up all data.
2.
Close all applications.
3.
Power down the server (on page
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to be
powered down and the last to be powered back up. Taking this precaution ensures that the system
does not erroneously mark the drives as failed when the server is powered up.
4.
Do one of the following:
o
Unlock and remove the bezel ("
Open or remove the tower bezel
" on page
o
Extend the server from the rack (on page
5.
Remove the access panel (on page
6.
Install the cache module ("
" on page
7.
Install the storage controller ("
" on page
), if not already installed.