86037630 pgs 4-11 and 4-12, Maintenance - gas – Prochem Apex User Manual
Page 39
MAINTENANCE - GAS
APEX 86037630
4-11
PACKING NUT ADJUSTMENT FOR
CHEMICAL METERING AND
CHEMICAL SELECTOR VALVES
Examine the packing nut on the chemical metering,
flow simulator, and chemical selector valves for
proper tension every 200 hours. When turning the
knob, there should be a small amount of resistance.
If not, slightly tighten the packing nut. DO NOT over-
tighten. Keeping the valve packings properly
adjusted will eliminate possible leakage from the
valve stems and add to overall valve life.
PRESSURE REGULATORS
The pressure regulators serve only to hold locked up
water pressure at a preset point and to bypass this
water back to the water box.
PRESSURE REGULATOR
To adjust:
1. With your unit running, close the cleaning tool.
Check the pressure gauge. Open the tool valve.
We recommend setting the pressure regulator
so that the pressure gauge reads 350 PSI with
the tool valve open.
When the tool valve is opened, there is an
approximate drop of 100 PSI in pressure. If
there is a pressure drop greater than 100 PSI,
it may be necessary to lubricate the o-rings
in the pressure regulator.
2. If the pressure regulator requires adjustment,
turn the adjusting knob (while observing the
pressure gauge on the control panel) until the
desired pressure is obtained.
ADDING/DRAINING ENGINE COOLANT
Use a 70:30 coolant to water ratio in this unit’s
cooling system. NOTE: See the “Maintenance
Chart” for specific details.
1. To drain the coolant, remove the radiator cap and
turn the lower engine radiator draincock counter-
clockwise.