Operation – Operation Procedures

990-2282A-001

Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation

21

Restart – parallel system.

Warning

Only trained personnel familiar with the construction and the equipment may

restart the UPS system.

From the XR Enclosure(s) (if available):

Connect the batteries on the UPS units by

pushing them in.

From the UPS: Connect the batteries by

pushing them in.

From the XR Enclosure(s) (if available): Set

the DC disconnect switch (if available) to the

ON

position.

From the external MBP: Turn all input

switches

(Q001)

to position “1”

(ON)

.

From the external MBP: Turn all output

switches

(Q002)

to position “1”

(ON)

.

From the external MBP: Turn the output

isolation breaker

(Q004)

to position “1”

(ON)

.

From the UPS: Turn load ON each of the UPS

units from the display via Control

Turn

Load on

Yes, turn Load on.

Check that the load is

ON

.

Note

The UPS system is now ready to support the load.

Note

Auto-detection on frequency – if a problem occurs call APC Customer Support (see the
back cover of this manual).