Operation Procedures

How to turn into bypass

Single System – turning into internal bypass.

Caution

The load is not protected by the UPS and the power is not conditioned when the internal
mechanical bypass lever is activated.

Warning

In bypass operation the batteries are still charged. If a total power off is required, the batteries
must be pulled out to the red disconnect line, see the section How to perform a total power off.

Note

This procedure is not applicable to parallel systems as the internal mechanical bypass lever is
unavailable.

Note

If the UPS is running and controllable through the display, carry out steps 1 through 5. If not,
go directly to step 6.

Check that the UPS is in bypass. The green

(LOAD ON)

and the yellow

(BYPASS)

LEDs

are lit.

Remove the Front Panel from the UPS (see

the Receiving and Unpacking sheet referred

to under the section Companion manuals).

Chrg 100%
Load 000%
xxxVin 000Vout x0Hz
Runtime: 0hr 0m

Press

Control
Status
Setup

Logging
Display
Diags

Help

Use

Press

UPS into Bypass
Do Self Test
Simulate Power Fail
Start Runtime Cal

Use

Press

Confirm:
UPS into Bypass
NO, ABORT
YES, UPS into Bypass

Use

Press