6 commissioning, 1 installation check, 2 switch on the device – Pyromation Series 642 User Manual
Page 18: 3 quick setup, Ä 18, Commissioning, Installation check, Switch on the device, Quick setup, 6commissioning
Commissioning
Series 642
18
Pyromation, Inc.
6
Commissioning
6.1
Installation check
Before commissioning the measurement point make sure that all final checks have been carried out:
• Checklist “Installation check”
• Checklist “Connection check”
6.2
Switch on the device
Once the power has been connected, the field transmitter is operational.
6.3
Quick Setup
Using the Quick Setup the operator is led through all the most important unit functions, which must
be set up for standard measurement operation of the unit.
Further set-up for special measurement applications are possible (see Section 6.4.1).
Standard set-up
Availability in TransComm Light and HART
®
communicator DXR375
(symbol
7
)
TransComm Light
7
Function
+
+
PV mode
+
+
PV unit
+
+
Sensor
Sensor type
+
+
Sensor connection
+
+
Unit
+
+
OUTPUT
PV lower range value
+
+
PV upper range value
+
+
Safety/maintenance functions
Fault condition
+
+
Alarm ambient temperature
+
+