HT instruments FULLTEST3 User Manual
Page 49

FULLTEST
3
EN - 48
5.9. POWER (POWER)
Measured appliance is supplied by mains voltage applied to schuko test socket. Switching the voltage
on/off as well as selection of phase position is done by internal switch of the tester.
5.9.1. POWER DISPLAY EXPLANATION
Adjustable/selectable parameters:
TIMER - measurement time
00:05
60:00, resolution 1 s
LIMIT - limit value of apparent power
6 VA
5.06 kVA
L POS - position of phase terminal on schuko socket
LEFT or RIGHT
Figure 36
: Display with POWER test result
1 ..... Selected function.
2 ..... Progress bar. It follows measurement time during the measurement.
3 ..... Two lines reserved for sub-results as follows: Mains voltages U
L/N
, Load current I
L
, Real power P,
Power factor PF and Leakage current I
PE
.
4 ..... Measurement screen touch-screen key.
5 ..... TIMER touch-screen key to adjust measurement time. Currently selected measurement time is
displayed on the bottom of the key.
6 ..... LIMIT touch-screen key to select limit apparent power. Currently selected value is displayed on the
bottom of the key.
7 ..... L POS touch-screen key to select the position of phase terminal on schuko socket during the
measurement. Currently selected position is displayed on the bottom of the key.
8 ..... Measurement result (in green colour - result OK, in red colour - result not OK).
9 ..... Real time clock (hh.mm.ss).
10 ... Unit of the test result.
11 ... Set measurement time.
12 ... Measurement result status (symbol
in green colour - result OK, symbol
in red colour - result
not OK).