beautypg.com

3 operating power, Operating power – Fire-Lite ACC-25/50DAZS Distributed Audio Panel User Manual

Page 37

background image

Distributed Audio Panel Manual — P/N 52265:B1 6/8/2010

37

Operating Power

Installation

3.3 Operating Power

AC Power and Earth Ground Connection

Primary power source is 120 VAC, 60 Hz, 1.57 amp for the ACC-25/50DA & ACC-25/50DAZS.
Overcurrent protection for this circuit must comply with Article 760 of the National Electrical
Code (NEC) and/or local codes. Make certain that the AC mains circuit breaker is off before mak-
ing any wiring connections between the mains and the panel. Run a pair of wires (with ground con-
ductor) from the protected premises main breaker box to TB10 of the main circuit board. Use 14
AWG (1.6 mm O.D.) or heavier gauge wire with 600V insulation. No other equipment may be

!

CAUTION:

DISCONNECT POWER

SEVERAL DIFFERENT SOURCES OF POWER CAN BE CONNECTED TO THIS PANEL.
DISCONNECT ALL SOURCES OF POWER BEFORE SERVICING. THE PANEL AND
ASSOCIATED EQUIPMENT MAY BE DAMAGED BY REMOVING AND/OR INSERTING CARDS,
MODULES OR INTERCONNECTING CABLES WHILE THIS UNIT IS ENERGIZED. ALSO, MANY
COMPONENTS ARE STATIC SENSITIVE WHICH REQUIRE THE USE OF PROPER
GROUNDING TECHNIQUES.

Backbox

Transformer Mounting Studs

acc2

5b

kb.wmf

Transformer Mounting Studs

Main Circuit Board

Mounting Studs

P10 Connector -
Transformer

AC

25

daxm

nt.w

m

f

AC Terminal TB10

P11 Connector - Battery

Transformer Assembly

Figure 3.4 Installation of Power Supply Transformer

This manual is related to the following products: