beautypg.com

AMT Datasouth 6000 User Manual

Page 19

background image

18 User's Guide

Fastmark 6000 Series

6. Route the ribbon under the print mechanism an onto an empty Take-up Core.

Figure 13 - Ribbon Installing

7. Important: Route ribbon as shown in the Ribbon Routing (Figure 13) before

attaching it to the Ribbon Take-Up core using tape or adhesive leader.

Figure 14 – Ribbon Take-up

8. Place the Ribbon Take-up core on the Ribbon Take-Up Spindle located towards the

front of the printer.

Printhead

Ribbon Take-up Core

Ribbon Take-up Spindle

This manual is related to the following products: