beautypg.com

Brocade EZSwitchSetup Administrator’s Guide (Supporting 300, 5100, 5300, 6505, 6510, 6520, 7800, 7840, and VA-40FC) User Manual

Page 36

background image

The EZSwitchSetup Configuration Finish window is displayed.

FIGURE 19 EZSwitchSetup Configuration Finish window

5.

Click Finish to complete the switch setup.

You are now ready to configure the storage component of the SAN using the documentation that
came with the storage server.

If you want to monitor the switch, then you need to launch the EZSwitchSetup Switch Manager.
Refer to

Managing Your Switch

on page 35 for instructions on using this interface.

Setting Up Your Switch

34

EZSwitchSetup Administrator’s Guide

53-1003129-01