Chapter 2 installation, Chapter 2, Installation -1 – ADTRAN TSU 120e User Manual
Page 29: Unpack, inspect, power up -1, Installation

61202129L1-1
TSU 120 User Manual
2-1
Chapter 2
Installation
UNPACK, INSPECT, POWER UP
Receipt Inspection
Carefully inspect the TSU 120 for any shipping damages. If
you suspect damage, file a claim immediately with the carrier
and then contact ADTRAN Customer Service (see inside the
last page of this manual). If possible, keep the original ship-
ping container for use in shipping the TSU 120 back for repair
or for verification of damage during shipment.
ADTRAN Shipments Include
•
The TSU 120
•
Two-line interface cable: an 8-position modular to 8-posi-
tion modular (15 ft.)
•
Loopback plug
•
DB 15 to RJ adapter
•
DB 25 to RJ adapter
•
An 8-position modular cable for connection to the chain-in
port (6 ft.)
•
The TSU 120 and TSU 120e User Manuals
Customer Provides
•
Cables for any expansion modules to be used with the TSU
120
•
10BaseT cable for connection to a LAN or router, if you plan
to use remote management features (TSU 120e only)