2 unpacking – IEI Integration ECW-281B-N270-WT v2.00 User Manual
Page 60
![background image](/manuals/356313/60/background.png)
ECW-281B Embedded System
Page 44
Step 6:
Power the system up
Step 0:
4.2.2 Unpacking
After the ECW-281B/281B2-R20 is received make sure the following components are
included in the package. If any of these components are missing, please contact the
ECW-281B/281B2-R20 reseller or vendor where it was purchased or contact an IEI sales
representative immediately.
Quantity Item
Image
1 ECW-281B/281B2-R20
embedded
system
1
Power cord
(optional for WD models)
1
Power adapter with ERP and PSE
certificates
(P/N: 63000-FSP025DGAA1702-RS)
2 Mounting
brackets
1
Screw set
1
Thermal pad for HDD
1
Quick installation guide
This manual is related to the following products: