beautypg.com

Functional verification tests, Before you begin the functional verification tests – ZOLL Propaq M Rev A User Manual

Page 26

background image

C

HAPTER

1

M

AINTENANCE

T

ESTS

22

9650-0804-01 Rev. A

Functional Verification Tests

Before You Begin the Functional Verification Tests

Assemble the tools listed in following section, “Equipment You Need to Perform the

Functional Verification Tests.”

Keep an extra fully charged Propaq M battery available.

Schedule an hour to conduct the entire maintenance test.

Perform the tests in the order presented.

Perform all the steps of each test procedure.

Complete all the steps of the procedure before evaluating the test results.

Equipment You Need to Perform the Functional Verification Tests

For testing purposes, you can substitute an equivalent device.

Fluke Impulse 7000DP Analyzer, or equivalent, with appropriate interface adapter

(Dynatech Nevada Inc. part number 3010-0378)

IBP/Temp Simulator, or equivalent

NIBP Simulator

Single or dual lumen NIBP hose

Adult NIBP cuff and a rigid cylinder to wrap it around

5% CO

2

calibration gas cylinder with CO

2

sample line (kit available from Scott Medical

Products, PN 4653ORF-BD)

ECG Simulator; 12 Lead Simulator for 12 Lead test (e.g., Symbio CS1201)

Accessories You Need for the Propaq M Options Functional Verification
Tests

3-lead, 5-lead and 12-lead ECG cables. (12-lead cable needed if 12-lead option is

installed.)

NIBP cuff and hose

IBP cable

SpO

2

cable

and sensor

EtCO

2

cable

and sensor

Paddles

Battery

Auxiliary power source