Calibration check procedure – ZOLL Propaq M Rev A User Manual
Page 14
C
HAPTER
1
M
AINTENANCE
T
ESTS
10
9650-0804-01 Rev. A
CO
2
Calibration Check Procedure
Equipment
5% CO
2
calibration gas cylinder with CO
2
sample line (kit available from Scott Medical
Products, PN 4653ORF-BD)
Procedure
1. On the Propaq M, do the following to enter the CO
2
Calibration control panel:
•
Press the CO
2
quick access key (
).
•
Use the navigation keys to select Supervisor>Service>Diagnostic>CO
2
>Calibration.
2.
Connect the Propaq M to the 5% CO
2
calibration gas cylinder using the sample line included
with the calibration kit.
3.
From the CO
2
Calibration control panel, select Verify Calibration.
4.
Activate the calibration gas flow by pressing the top valve on the calibration gas canister.
5.
Continue to apply the calibration gas until the status in the CO
2
Calibration control panel
displays: CALIBRATION GAS CAN BE REMOVED.
•
When the calibration check is complete, the status in the CO
2
Calibration control panel
displays: VERIFICATION DONE - OK OR VERIFICATION DONE - ERROR.
•
When the calibration check completes successfully, the measured gas value displays in
the CO
2
Calibration control panel.
Acceptable Results
The message displays: VERIFICATION DONE - OK.
The measured gas reading passes if it is between 4.8 and 5.2 (Vol%).
Corrective Action
If an error is reported, refer to Table 1-1 on page 9 for possible causes.
If the measured gas reading is outside the acceptable range, or if calibration is due, complete
the “CO2 Calibration Procedure (required for annual calibration)” on page 9.
CO
2
CO
2