Installation (continued) – Vestil CC-30-MC User Manual
Page 43
October 15
th
, 2001
Help Line: 800-363-2488
42
INSTALLATION (continued)
USING LOAD CELLS TO DETECT A BLOCKAGE
If load cells are installed at the top of the chute, users will be able to monitor the
weight of the chute. An increase in the weight of the chute indicates that a
blockage has occurred. For further information on load cells and their use in a
chute system, please contact Superchute
®
Ltd.
Close up view of a load cell kit.
A pair of load cells
Shown on a Hoister
See also other documents in the category Vestil Equipment:
- ABLT-H (7 pages)
- ABLT-H-LP (5 pages)
- ACH-60 (20 pages)
- ALL-T-2-GPT (10 pages)
- ALL-T-2 (9 pages)
- A-LIFT (12 pages)
- AIR-2000 (12 pages)
- AHLT (12 pages)
- AHA-KIT Come-Along kit (5 pages)
- AHA (25 pages)
- AF-xxxx (4 pages)
- APPL-1200-xx (1 page)
- ASP Series (5 pages)
- ATD (6 pages)
- ATP (9 pages)
- ATS (9 pages)
- BC series (12 pages)
- BOL-OR-40-BK (3 pages)
- BOL-SS-42-5.5 (5 pages)
- BOL-SSTOR-42-4.5 (5 pages)
- BT (20, 40, & 60) (12 pages)
- SELF SUPPORTING BRIDGE CRANE (9 pages)
- CART-DS-1000 (15 pages)
- CAN-A (1 page)
- CART-23 & -24, ALL MODELS (12 pages)
- CART-500-SCL (1 page)
- CART-550-SS (15 pages)
- CART-D-FR (18 pages)
- CART-S-FR (18 pages)
- CB-PMPS (13 pages)
- CBS Series (13 pages)
- CB-W-P (1 page)
- CB-W-S (1 page)
- CH series (12 pages)
- COL-3-26-14 (5 pages)
- CYL-CK (1 page)
- CUP-3131 (4 pages)
- CPC (10 pages)
- CP Series (8 pages)
- COL-4-36-23 (5 pages)
- COL-3-26-44 (5 pages)
- COL-3-26-23 (5 pages)
- H series hoppers (13 pages)
- D-150 Dock Seals & Shelter Survey Sheet (1 page)