Select an installation area – Vestil CC-30-MC User Manual
Page 20
19
Help Line: 800-363-2488
October 15
th
, 2001
SELECT AN INSTALLATION AREA
(continued)
SPECIAL CASES
In cases where the building exterior is stepped or irregular, consider the following options:
1. Can the chute be installed in an unused elevator shaft, inside the building?
This option is usually feasible on new construction projects.
2. Can the chute be split into two or more vertical lengths? See the sketch below for
clarification.
Twin Containment Areas.
Empty one while the other fills.
See also other documents in the category Vestil Equipment:
- ABLT-H (7 pages)
- ABLT-H-LP (5 pages)
- ACH-60 (20 pages)
- ALL-T-2-GPT (10 pages)
- ALL-T-2 (9 pages)
- A-LIFT (12 pages)
- AIR-2000 (12 pages)
- AHLT (12 pages)
- AHA-KIT Come-Along kit (5 pages)
- AHA (25 pages)
- AF-xxxx (4 pages)
- APPL-1200-xx (1 page)
- ASP Series (5 pages)
- ATD (6 pages)
- ATP (9 pages)
- ATS (9 pages)
- BC series (12 pages)
- BOL-OR-40-BK (3 pages)
- BOL-SS-42-5.5 (5 pages)
- BOL-SSTOR-42-4.5 (5 pages)
- BT (20, 40, & 60) (12 pages)
- SELF SUPPORTING BRIDGE CRANE (9 pages)
- CART-DS-1000 (15 pages)
- CAN-A (1 page)
- CART-23 & -24, ALL MODELS (12 pages)
- CART-500-SCL (1 page)
- CART-550-SS (15 pages)
- CART-D-FR (18 pages)
- CART-S-FR (18 pages)
- CB-PMPS (13 pages)
- CBS Series (13 pages)
- CB-W-P (1 page)
- CB-W-S (1 page)
- CH series (12 pages)
- COL-3-26-14 (5 pages)
- CYL-CK (1 page)
- CUP-3131 (4 pages)
- CPC (10 pages)
- CP Series (8 pages)
- COL-4-36-23 (5 pages)
- COL-3-26-44 (5 pages)
- COL-3-26-23 (5 pages)
- H series hoppers (13 pages)
- D-150 Dock Seals & Shelter Survey Sheet (1 page)