INSTALLATION (continued)

USING A SCAFFOLD, STAGE, OR PLATFORM AS AN ANCHOR
























• If

a

scaffold, suspended stage, platform or similar structure is

used to support the chute, and a blockage occurs in the chute,
the additional weight could cause the structure to topple or fail.


• The collapse of the support structure and chute could cause

serious injury or death.


• The support structure must be capable of holding at least five

times the weight of the chute, in addition to being able to hold the
weight of men, machinery, and materials with an adequate safety
factor.


• A structural engineer must verify the adequacy of the support

structure.

WARNING

!

Additional Guidelines For Chutes Anchored To Scaffolds:

• The scaffold should be installed by professional scaffold

erectors.


• The scaffold should be erected and tied in accordance with

government regulations and manufacturer’s instructions or
as designed by an engineer.


• The chute must be restrained to the scaffold at intervals of

less than 25 feet (8 meters), in order to prevent wind sway.

The sketch on the left shows the chute installed inside
the scaffold. This arrangement is best as it distributes
the weight of the chute evenly on the scaffold.