Installation (continued), Warning – Vestil CC-30-MC User Manual
Page 35
October 15
th
, 2001
Help Line: 800-363-2488
34
INSTALLATION (continued)
As you link Regular sections together, arrange them so
that the plastic weld or Wraparound
®
clasp alternates
from side to side, as depicted in the sketch on the right.
Alternating the clasps will help the chute hang straight.
Do NOT place hands between
chute sections.
WARNING
!
• Lower the suspended section into the
section beneath it.
• Connect the two sections with the upper
section’s cable assemblies.
Align chute sections
so that seams alternate
from left to right.
See also other documents in the category Vestil Equipment:
- ABLT-H (7 pages)
- ABLT-H-LP (5 pages)
- ACH-60 (20 pages)
- ALL-T-2-GPT (10 pages)
- ALL-T-2 (9 pages)
- A-LIFT (12 pages)
- AIR-2000 (12 pages)
- AHLT (12 pages)
- AHA-KIT Come-Along kit (5 pages)
- AHA (25 pages)
- AF-xxxx (4 pages)
- APPL-1200-xx (1 page)
- ASP Series (5 pages)
- ATD (6 pages)
- ATP (9 pages)
- ATS (9 pages)
- BC series (12 pages)
- BOL-OR-40-BK (3 pages)
- BOL-SS-42-5.5 (5 pages)
- BOL-SSTOR-42-4.5 (5 pages)
- BT (20, 40, & 60) (12 pages)
- SELF SUPPORTING BRIDGE CRANE (9 pages)
- CART-DS-1000 (15 pages)
- CAN-A (1 page)
- CART-23 & -24, ALL MODELS (12 pages)
- CART-500-SCL (1 page)
- CART-550-SS (15 pages)
- CART-D-FR (18 pages)
- CART-S-FR (18 pages)
- CB-PMPS (13 pages)
- CBS Series (13 pages)
- CB-W-P (1 page)
- CB-W-S (1 page)
- CH series (12 pages)
- COL-3-26-14 (5 pages)
- CYL-CK (1 page)
- CUP-3131 (4 pages)
- CPC (10 pages)
- CP Series (8 pages)
- COL-4-36-23 (5 pages)
- COL-3-26-44 (5 pages)
- COL-3-26-23 (5 pages)
- H series hoppers (13 pages)
- D-150 Dock Seals & Shelter Survey Sheet (1 page)