beautypg.com

Vanguard EZCT-S2 User Manual

Page 42

background image

EZCT S2 USER’S MANUAL

REV 3

38

3.4.5. Loading a Test Plan from the EZCT S2’s Flash EEPROM

To use a test plan for running a test, it must first be loaded into the working memory. To load a
test plan from the EZCT S2’s Flash EEPROM into the working memory:

a. Start from the “START-UP” menu:

Press the

[3]

key (TEST PLANS).

b. The following screen will be displayed:

Press the

[1]

key (LOAD TEST PLAN).

c. The following screen will be displayed:

Type the test plan number that you would like to load and press the

[ENTER]

key. If

you do not know the test plan number, you can print a test plan directory using the
instructions in section 3.4.2.

d. The following screen will be displayed:

Press any key to return to the “START-UP” menu.

TEST PLAN LOADED!


LOAD TEST PLAN

NUMBER:

1.

LOAD TEST PLAN

2.

UNLOAD TEST PLAN

3.

PLAN DIRECTORY

4.

NEXT PAGE

1.

RUN TEST 09/24/09

2.

SETUP 08:20:19

3.

TEST PLANS

4.

DIAGNOSTIC