Securitron AKG User Manual
Page 2
PN# 500-10600
Page 2
Rev. D, 06/11
If the bracket slides a bit it can be repositioned only if this is done very quickly. The adhesive
will set in about 2 minutes. The clamp, however, should be left on for about 30 minutes to
provide a stronger set. The strike may then be installed, but if it does not delay the job, it is
wise to wait 2 hours before putting pressure on the bracket. Full cure of the adhesive takes
about 12 hours. Curing time is dependent on temperature. The higher the temperature, the
more rapidly curing occurs. If temperature is below 60 degrees F, the clamp should be left in
position for 60 minutes.
Adhesive which is squeezed out from the bracket will not cure. Anerobic adhesive will only cure
in the absence of oxygen which occurs only between the glass and the aluminum. Excess
adhesive can therefore be cleaned up with a razor blade or non petroleum based solvent.
GLA
SS
DOO
R
GLA
SS
DOO
R B
RAC
KET
STR
IKE
5/16-18 X 1"
FLATHEAD SCREW
1/4" X 3/4"
ROLL PINS
ADHESIVE
BOND
2 X RUBBER
WASHERS
BE SURE THAT FLY CUT SIDE OF BRACKET FACES GLASS
BE SURE THAT BRACKET IS POSITIONED CORRECTLY BEFORE GLUING
5. APPLICATION OF DRESS PLATE
A stainless steel self adhesive "dress plate" is included with the GDB bracket. It is intended that
this plate be affixed to the outside of the glass door to improve the appearance of the
installation. The plate will prevent viewing the glass door bracket through the glass, from the
outside.