beautypg.com

Electronics International CGR-30P User Manual

Page 7

background image

3.8 Connect the EDC Harness to the EI P-300C Capacitive Fuel Level Probes: ----- 30
3.9 Connect the EDC Harness to the P-300M Magnetic Fuel Level Senders: ---------- 31
3.10 Connect the EDC Harness (Volts Meassurement Pin) to the Bus: ----------------- 31
3.11 Connect the EDC Harness to the RPM Signals: ---------------------------------------- 31
3.12 Setup the EDC for a 4 or 6-Cylinder Engine: ------------------------------------------- 31
3.13 Connect the EDC Harness to the VI-221's (Voltage Interface Units): ------------- 31
3.14 Connect the EDC Harness to Power and Ground: ------------------------------------ 32
3.15 Route the EDC 5V-Serial Wire to the CGR Connector: ------------------------------ 32

4.0 Install the CGR Wire Harness and Route the Wires ------------------------------------------- 33

4.1 Attach the CGR 25-pin D-sub Connector to the CGR: -------------------------------- 34
4.2 Connect the EDC 5V-Serial Output Wire to the CGR 5V-Serial Input Wire: ----- 34
4.3 Connect the CGR Harness to the Master Warning and Caution Lights: ------------- 34
4.4 Connect the CGR Harness to the Voice Alarm Control Panel (AV-17CP): -------- 34
4.5 Connect the CGR Harness to the Audio Panel (OEM/Experimental): ------------- 35
4.6 Connect the CGR Harness to the Backlight Control Pot: ------------------------------ 35
4.7 Connect the CGR Harness to the Moving Map Data Out from the GPS: ---------- 35
4.8 Connect the CGR Harness to the Fuel Data Input on the GPS: ---------------------- 35
4.9 Connect the CGR Harness to Power and Ground: -------------------------------------- 36
4.10 Connect the CGR Harness to the CO-Guardian CO Detector: --------------------- 36

5.0 Mandatory System Setup and Checkout --------------------------------------------------------- 37

5.1 Power-On Checkout -------------------------------------------------------------------------- 38
5.2 Perform all Steps Listed in the "CGR-30P Setup Checklist" ------------------------ 38
5.3 Ground Run Checkout ------------------------------------------------------------------------ 38
5.4 First Flight Checkout -------------------------------------------------------------------------- 39
5.5 Read the "Warranty/Agreement" and the "Important Notice" ----------------------- 39

6.0 Installation Data -------------------------------------------------------------------------------------- 40

6.1 Instructions for Continued Airworthiness (ICA): ----------------------------------------- 41
6.2 Airworthiness Limitations: -------------------------------------------------------------------- 41
6.3 Installing a D-sub Pin onto a TC or Tin Copper Wire: ---------------------------------- 41

CGR-30P Wiring Work Sheet -------------------------------------------------------------------- 43
EDC Wiring Work Sheet Top Connector ------------------------------------------------------ 44
EDC Wiring Work Sheet Middle Connector --------------------------------------------------- 45
EDC Wiring Work Sheet Bottom Connector -------------------------------------------------- 46
EDC Template -------------------------------------------------------------------------------------- 47

7.0 Troubleshooting --------------------------------------------------------------------------------------- 48

7.1 CGR or EDC Problem ------------------------------------------------------------------------ 49
7.2 Pressure Problem with one Function ------------------------------------------------------- 50
7.3 Temperature Problem on all Channels ----------------------------------------------------- 50
7.4 Temperature Problem with one Function ------------------------------------------------- 51
7.5 RPM Problem ----------------------------------------------------------------------------------- 51

7.6 Fuel Flow Problem ----------------------------------------------------------------------------- 52

Contents

(Page 2 of 3)