beautypg.com

Electronics International CGR-30P User Manual

Page 16

background image

2.0

2.0

2.0

2.0

2.0

Hardware Installation

Hardware Installation

Hardware Installation

Hardware Installation

Hardware Installation

2.1 Important Information and Initial Checkout:

2.2 Review the "EDC Wiring Work Sheets:"

2.3 Verify You Have all the Probes, Modules, Transducers and Cables:

2.4 Install the CGR Display:

2.5 Install the Temperature Probes:

2.6 Install the Pressure Transducers:

2.7 Install the Interface Circuit for Annunciators:

2.8 Install the CO Detector, G-Sensor and/or Other Available CGR Options:

2.9 Install the Shunt:

2.10 Install the Fuel Flow Transducer:

2.11 Install the EI P-300C Fuel Level Probes (OEM or Experimental Only):

2.12 Install the EI P-300M Fuel Level Sender:

2.13 Install the Resistive Fuel Level Module (RFLM-4-X):

2.14 Install the Voice Alarm Control Panel (OEM/Experimental Only):

2.15 Install the Intensity Control Pot (Optional):

2.16 Install the Master Warning (red) and Caution (yellow) Lights:

2.17 Installing the EDC-33P:

7