beautypg.com

Installation – Teledyne LXT-220 User Manual

Page 19

background image

Dissolved Oxygen Controller

Installation

Teledyne Analytical Instruments

19

Installation

Installation of the LXT-220 Controller involves:

• Unpacking the instrument

• Mounting

• Making Electrical Connections

• Configuring the Instrument

• Calibration

2.1 Unpacking the Instrument

The LXT-220 Controller has been carefully packaged to protect it

from damage during shipment and dry storage. Upon receipt please
follow the procedure outlined below:

1. Before unpacking, inspect the condition of the shipping container

to verify proper handling by the carrier. If damage is noted, save
the shipping container as proof of mishandling for the carrier.

2. Check the contents of the shipping container with the items and

quantities shown on the packing list. Immediately report any
discrepancies to TI/TAI.

3. Save the original packing material until you are satisfied with the

contents. In the event the transmitter must be returned to the
factory, the packing material will allow you to properly ship it to
TI/TAI.

4. Familiarize yourself with the instrument before installation, and

follow proper installation and wiring procedures.

2.2 Mounting

Three typical installation configurations are available for the LXT-

220:

• Universal mounting plate