beautypg.com

Installation – Teledyne 2010B - Split architecture thermal conductivity analyzer User Manual

Page 75

background image

Thermal Conductivity Analyzer

Part II: Analysis Unit

Teledyne Analytical Instruments

Part II: 2-1

Installation

Installation of the Model 2010B Analyzer includes:

1. Unpacking, mounting, and interconnecting the Control Unit and

the Analysis Unit

2. Making gas connections to the system

3. Making electrical connections to the system

4. Testing the system.

2.1

Unpacking the Analysis Unit

The analyzer is shipped with all materials needed to install and prepare the

system for operation. Carefully unpack the Analysis Unit and inspect it for
damage. Immediately report any damage to the shipping agent.

2.2

Mounting the Analysis Unit

The Model 2010B Analysis Unit is for use in Class 1, Division 1,

Groups C and D, hazardous environments (group B available). The actual
class is limited by the flame arrestor option.

The standard model is designed for bulkhead mounting. Overall dimen-

sions of the Analysis Unit will vary depending on options. The maximum
footprint will be 19

×

12

, and maximum height 9.4

. An Outline Drawing

at the back of this manual, gives the correct mounting dimensions for your
unit.

Note: The housing, including the cover, protrudes 8.6 to 9.4

inches

from the base on which it is mounted. Enough clearance is
required in front of the cover to allow the cover to be re-
moved.

Figure 3-1 is a view with the cover removed showing the external Gas

Connector Panel and the internal Electrical Connector Panel.