beautypg.com

Installation – APC GALAXY 5000 User Manual

Page 27

background image

34001813EN/AE

- Page 27

2. Installation

UPS units with separate normal and Bypass AC inputs

To access the connection terminal blocks,
see section 1.2.

1 - The earthing conductors must be

connected to the earthing plate of each UPS.
2 - Connect the three phases of the Normal

AC source to terminal block (16) in each UPS

unit.
3 - Connect the four conductors of the Bypass

AC source to terminal (61) in the bypass

cabinet.
4 - Connect terminal blocks (15) in each UPS

unit to terminal (60) in the bypass cabinet,

using cables with identical lengths and sizes.
5 - Connect the four load conductors to

terminal (62) in the bypass cabinet.

6 - Connect terminal blocks (14) in each UPS
unit to terminal (63) in the bypass cabinet,

using cables with identical lengths and sizes.

7 - Tie the cables down to the frames of the
UPS cabinets and the bypass cabinet.

8 - Put the covers back in place (see section

1.2).

The cables marked A must be identical,
i.e. same size and length.

Similarly, the cables marked B must be

identical, i.e. same size and length.

To avoid errors, it is advised to remove the handle on switch Q3BP (10) in each UPS.

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

370 mm

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

370 mm

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

370 mm

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

370 mm

14

16

15

14

16

15

Q4S

Q3BP

Q5N

L1

L2

L3

N

L1

L2

L3

N

L1

L2

L3

N

L1 L2 L3

N

60

61

62

63

14

16

15

14

16

15

17

18

17

18

17

18

17

18

A

B

A

B

A

B

A

B

To

Normal

AC
source

To bypass AC source

To normal AC /
bypass AC

To normal AC /
bypass AC

To normal AC /
bypass AC

To Normal AC
source

To Normal AC

source

To
Normal

AC

source

UPS 1

UPS 2

Bypass

UPS 3

UPS 4

To load