beautypg.com

Connection of earth cable and tying of cables, Installation – APC GALAXY 5000 User Manual

Page 24

background image

34001813EN/AE

- Page 24

2. Installation

2.8 Connection of power cables for parallel UPS units

Equipotential bonding between parallel-connected units

Connect the exposed conductive parts (ECP) of the parallel-connected UPS units using an additional earthing cable (not
supplied) with the following characteristics:

- size equivalent to that of the supply cables,

- as short as possible.

Connection of earth cable and tying of cables

Connections must be made according to the diagram below:

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

N L1 L2 L3

N L1 L2 L3

L1 L2 L3

Main earth

Main earth

Additional equipotential

bonding between units.

UPS 1

UPS 3

UPS 2