beautypg.com

5 2.5 system earthing arrangements, Tns upstream and tns downstream installation, With differential circuit breaker – APC GALAXY 5000 User Manual

Page 17: Without differential circuit breaker, Installation

background image

34001813EN/AE

- Page 17

2. Installation

2.5 2.5 System earthing arrangements

This chapter lists the main system earthing arrangements and their wiring requirements. For system earthing arrangements
which are not listed in this document, please refer to the “SEA guide” reference 34002636XT..

TNS upstream and TNS downstream installation

For separate Normal AC and Bypass AC lines from a single source.

With differential circuit breaker:

Without differential circuit breaker:

The Normal and Bypass AC lines must be galvanically isolated

Upstream differential protection rating must be at least 3A

Bypass AC

Normal AC

L1
L2
L3

L1
L2
L3

N

L1
L2
L3
N

Load

SS

UPS

PFC

INV

PE

MLVS

PE

PE

Bypass AC

Normal AC

L1
L2
L3

L1
L2
L3

N

L1
L2
L3
N

Load

PE

SS

UPS

PFC

INV

PE

MLVS

PE