beautypg.com

Reassembling the meter, Reassembling the weldment assembly – Liquid Controls MS Meters User Manual

Page 30

background image

30

Reassembling the Meter

Reassembling the Weldment Assembly

12. Install a new O-Ring in the groove around the

weldment base assembly if required.

13. Position the weldment cover on top of the weldment

base so that the cover vent plug is on top.

Install the screws around the rim of the weldment
cover. Attach the nuts to the back of each screw.
Begin by hand-tightening each of the screws. Once
this is complete, tighten the nuts and bolts to the
proper torque following the tightening sequence on
Page 31.

14. To complete the reassembly, reinstall the adjuster

and drive components. When this is complete,
reinstall the dust cover.