This gate operator must be properly grounded – Controlled Products Systems Group 1150-080 User Manual
Page 14

1150-065-F-1-11
12
2.1 Conduit Requirements
SECTION 2 - WIRING
Before attempting to connect any wiring to the operator, be sure that the circuit breaker in the electrical panel is in the OFF
position. Permanent wiring must be installed to the operator as required by local electrical codes. It is recommended that a
licensed electrical contractor perform this work.
Since building codes vary from city to city, we highly recommend that you check with your local building department prior
to installing any permanent wiring to be sure that all wiring to the operator (both high and low voltage) complies with local
code requirements.
THIS GATE OPERATOR MUST BE PROPERLY GROUNDED!!
•
The conduit requirements are for a typical overhead gate operator installation. The conduit requirements for your
application may vary from this depending on your specific needs.
•
Use only sweeps for conduit bends. Do not use 90° connectors as this will make wire pulls very difficult and can
cause damage to wire insulation.
•
We suggest that minimum ¾-inch conduit be used.
•
Be sure that all conduits are installed in accordance with local codes.
Low V
oltage Control Wires
Loop Lead-In Wires
High V
o
ltage Power
3/4 Inch rigid conduit minimum.
Use sweeps for bends.
3/4 Inch Flexible
Dry Conduit.
LIMIT
LIMIT
PA
R
T
TIME DELA
Y
REV SENSE CLOSE
REV SENSE
OPEN
1
ON
2 3 4
1
ON
2 3 4 5 6 7 8
NO
NC
EXIT LOOP
REVERSE LOOP
GA
TE FORCED
PUSH T
O
OP
E
RA
T
E
technician use only