Initial system checkout, Figure 12 system block diagram, 12 initial system checkout – CTI Products TSAM Transmitter Steering & Audio Matrix User Manual
Page 40
TSAM Installation and Maintenance Rev. 2.10
Chapter 4
CTI Products, Inc.
Installation
32
4.12
Initial System Checkout
A system block diagram for a system with secondary operation is shown in Figure 12. As can be seen
from studying the diagram, the TSAM connects to the following system equipment: The steered base
stations and receivers, the system comparator, the Centracom Series II console, and Smartswitch II
controller. Your system connection will vary, depending upon system equipment.
Figure 12 System Block Diagram
Interconnection is accomplished with a TELCO style patch panel consisting of 66 type punch blocks or a
prewired patch panel. Use of a prewired patch panel requires metering access to the TSAM transmitter
audio outputs and receiver inputs. These points may be accessible from the TELCO line interface
equipment, or by connecting a type 66 punch block in series with the 25 pair TX or RX cable.
Many TSAM features may be unused and unconnected on your system. Skip any test procedures for
functions that do not apply to your system.
Tip:
The factory set levels are adequate for performing initial system check out. Final level setting is
performed after successful completion of the system checkout.