beautypg.com

3 assembly, Assembly, Preparing for operation 35 – Cashco Siemens PS2 I/P User Manual

Page 35

background image

Preparing for Operation

35

SIPART PS2 Manual

A5E00074631-01

M8, 14 deep (4x)

23

129,5

Æ 8 h9

3,5

235,3

60

M6, 11 deep (4x)

All air connections

G

1/

4

or

1

/

4

”NPT

7,5

25,7

14,3

1)

M6, 8 deep (2x)

M20, M25 or

1/

2

”NPT (2x)

87,2

65

43

7,75

50

Ж

Ж

136.5

34

25

4,5

10,25

19,25

33,5

33,5

7

12

E

82,5

158,5

1)

Connection 238/Y2 only in

double action version

Figure 3-4

Dimensional drawing for positioner with metal housing in explosion proof
version 6DR5xx5

3.3 Assembly

!

WARNING
To avoid injury or mechanical damage to the positioner/mounting kit,

the following order must be observed for assembly:
1. Mechanical fitting of positioner

this chapter

2. Connection of electric power supply

see chapter 3.4, p. 48

3. Connection of pneumatic power supply see chapter 3.5, p. 56
4. Put into operation

see chapter 3.6, p. 57

Please also observe the warning on page 48!

General