5 mounting, installation, adjustment, 1 provisions to be provided, 5mounting, installation, adjustment – FlexLink X45 Руководство пользователя User Manual
Page 30
Mounting, installation, adjustment
22
5113196-2
5
Mounting, installation, adjustment
This section deals with the operations to have the modules function well
within a (transport) system.
Longer conveyor modules (approx >3m) are delivered in sections. The sec-
tions are marked up and can easily be joined together. Also the corre-
sponding conveyor chain is marked up and has to be assembled according
to section 5.2.
5.1
Provisions to be provided
Make sure before assembly that the surroundings are clean and free from
obstacles and the mounting surface is clean and level. Besides, it should
be repeated that the operations are to be carried out in a calm and control-
led way!
After having placed the modules in the correct position, the modules is to
be fastened to the mounting surface by using the holes in the adjusting
feet.