beautypg.com

2 unloading instructions, 1 shipment – FlexLink X45 Руководство пользователя User Manual

Page 29

background image

Unload the X45 system

Create

d

by EBCCW

0

0

:06

21

5113196-2

4.2

Unloading instructions

Before starting unloading, all fastening means (securing belts, screws, etc.)
that secure the module unto the means of transport must be removed. Sub-
sequently check whether the transport supports are still connected well to
the module. After this the unloading procedure may be started.

4.2.1

Shipment

Modules are normally delivered in flat boxes with a maximum length of ap-
proximately 3 m. See photo below. Conveyor modules will be delivered in
sections of maximum 3 m which are easy to reassemble.

. .