beautypg.com

Draw-Tite 6300 REMOV-A-BALL GOOSENECK User Manual

Page 3

background image

9. Install 5/8" x 2.50” Grade 5 carriage bolts through the platform, shims and under vehicle supports. Secure with flat
washers, lock washers and nuts. Torque nuts to 150 LB-FT.
10. Install the (2) U-bolts through the platform. From under the truck install large flat washer over the U-bolt followed
by a spring, another large flat washer and secure with a thin 5/8” jam nut. Repeat for the other legs of the U-bolts.
The 5/8” jam nuts are to be tightened until 3 threads are visible past the bottom of the nut.

REMOV-A-BALL

®

GOOSENECK BALL INSTALLATION AND OPERATION

After installation, with a finger in the Z-slot raise the handle pulling it rearward and sliding it toward the side of the
truck. This will allow the hitch ball to be installed into the tube. Orient the through hole in the ball so it lines up with
the sliding pin. Move the handle toward the ball and then push it forward in the Z-slot to lock the handle into a closed
position.

Cover the slot with the magnetic cover provided. This cover will keep road mud and debris out of the bed and away
from your cargo.

AFTER SYSTEM INSTALLATION AND BEFORE TOWING:
Connect trailer to the tow vehicle following coupler manufacturer’s operating instructions.
The coupler must be adjusted to provide about 6” of clearance between the bottom of the trailer nose and the top of the
pickup bed sides.

Fig. 4

INSTRUCTION PART NO. N6300 1-21-13 F © 2000, 2001, 2002, 2005, 2007, 2011, 2013 CEQUENT PERFORMANCE PRODUCTS PRINTED IN U.S.A.

pickup bed sides.

Slowly back the trailer to a jackknifed position to the tow vehicle while checking to see there is adequate clearance
between the gooseneck trailer and the rear of the vehicle. Also check to see there is adequate clearance between the
forward corners of the gooseneck trailer and the cab of the truck. Slowly jackknife the truck and trailer in the opposite
direction and check the clearances to the end of the truck and the cab.

REMOV-A-BALL

®

GOOSENECK MAINTENANCE

-Keep assembly free of dirt and debris.
-Lubricate hitch ball monthly or as needed with heavy grease.
-Lubricate ball tube with heavy grease when ball is installed and/or removed.
-Lubricate locking pin monthly or as needed with spray-on penetrating oil.
-Check bolt torque monthly.
-Check equipment before towing for worn or damaged parts.

REPLACE WORN OR DAMAGED PARTS

IMMEDIATELY.