Draw-Tite 30080 FIFTH WHEEL RAILS User Manual
Page 3
![background image](/manuals/328349/3/background.png)
30080IN – 8/21/08, rev B
PCN11321
©2003, 2008 CEQUENT TOWING PRODUCTS
Litho in USA 3
Choose 8 holes
identified by black dots
that correspond with
your individual
configuration.
Use side bracket/hitch base assembly to position rails (not included)
Rear Edge of
Truck Bed
Rear Edge of Truck bed to
Rear Edge of Base Rail
Front
of
Truck
Drill locations will vary. See individual installation for location
Measure diagonal
from same
reference point.
Measurement
should be the
same.
WARNING:
DO NOT lubricate threads. It may cause bolt failure.
11. Torque all nuts to 75 lb-ft
12. Pull wire provided to pull bolts through frame as needed per application
Fig. 2
CAUTION:
It is important that 17/32" drill be used for holes in chassis frame as rib neck bolts
may break if too small a hole is used and neck may not grip if too large a hole is used.
Note: On vehicles with heavy duty suspensions, check for interference with bolts where brackets are
mounted to frame. If interference with suspension spring results, cut bolt flush to nut outboard of frame
or use weld option.
CAUTION:
Check for obstructions before drilling. Failure to do so could result in damaged fuel or
brake lines, structural members, etc. CEQUENT TOWING PRODUCTS does its best to
communicate tow vehicle manufacturer changes; however, it is ultimately the
responsibility of the installer to prevent damage due to installation.
RO
W
1
RO
W
2
RO
W
3
RO
W
4