Draw-Tite 24801 SPORTFRAME HITCH User Manual
Installation instructions, Nissan altima coupe 2.5 s & 3.5 se, Part numbers

Tighten all ½-13 GR5 fasteners with torque wrench to 75 Lb.-Ft. (102 n*m)
Fastener Kit: 24801F
Installation Instructions
Nissan Altima Coupe 2.5 S & 3.5 SE
Part Numbers:
60877
24801
77172
Hitch Shown In Proper Position
Wiring Access Location: PC3, PC4
Equipment Required: Pliers
Wrenches: ¾”
Drill Bits: None
1.
Open up hole in frame to allow hardware to be fished into frame, One hole per side. ( See above )
2.
Insert hardware into frame (as per above illustration) using the bolt leaders provided.
3.
Slide frame brackets of hitch between trial pipes and frame of vehicle. Line up holes in frame brackets of hitch with hardware in
frame that was installed in step #2.
4.
Remove bolt leaders from bolts and install the remaining hardware (as per above illustration). See below for torque specs.
Rev. A
9-12-07
24801N
Sheet 1 of 3
z
2006 Cequent Towing Products
½” Conical Washer
Qty. (4)
3
½” Bolt Leader
Qty. (4)
5
¼ X 1 X 3 Spacer
Qty. (4)
2
½-13 Hex Nut
Qty. (4)
4
½-13 x 1 ¼ Carriage Bolt
Qty. (4)
1
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
2000 LB (908Kg) Max Gross Trailer Weight
200 LB (90.8) Max Tongue Weight
Do Not Exceed Lower of Towing Vehicle
Manufacturer’s Rating or
Drawbar must be used in the
Rise position only.
Drawbar Kit:
3594
Form F206 Rev A 5605
Fascia
4
3
2
1
5
Open up these holes to fish hardware into frame
2
1
2
1
2
1
4
3
4
3
4
3