Draw-Tite 36502 FRAME HITCH User Manual
Installation instructions, Buick lucerne buick lucerne super, Part numbers
Installation Instructions
Buick Lucerne
Buick Lucerne Super
Part Numbers:
Do Not Exceed Lower of Towing Vehicle
Drawbar Kit:
36063
36502
90125
06125
Frame rails
Fascia
Hitch Shown In Proper Position
Wiring Access Location: TBD
Equipment Required: Pull wire ( Provided)
Do Not Exceed Lower of Towing Vehicle
Manufacturer’s Rating or
Drawbar must be used in the
Rise position only.
36063
F t
Kit 36502F
Frame rails
A
h l
Existing Weldnuts - Typ
3500 LB (1589 Kg) Max Gross Trailer Weight
300 LB (136 Kg) Max Tongue Weight
Wrenches: 15mm, 17mm, 9/16”, 11/16”
Fastener Kit: 36502F
Kink pull wire to keep
block independent of bolt
3
6
2
2
3
7
8
5
4
Access hole
st g We d uts
yp
1
Qty. (2)
Bolt Assembly M10 x 1.50 x 45mm CL9.8
5
Qty. (2)
Hex Nut 7/16-14
2
Qty. (2)
Carriage Bolt 7/16-14 x 1.75 GR5
6
Qty. (2)
Carriage Bolt 3/8-16 x 2” GR5
Existing hole
Frame rails
Example of pull wire procedure
1
5
4
1
2
y ( )
g
6
y ( )
g
3
Qty. (2)
Spacer ¼ x 1 x 3
7
Qty. (2)
Flanged Locknut 3/8-16
4
Qty. (2)
Conical Washer 7/16”
8
Qty. (2)
Exhaust Hanger Bracket
1. Remove nut holding rubber isolator to exhaust bracket (17mm wrench). On vehicles with dual exhaust repeat process on both sides.
2.
Remove exhaust mounting bracket from vehicle frame. Replacement bracket is provided and will be installed later. Return factory exhaust
brackets to vehicle owner.
3.
Use pull wires to feed the carriage bolts and blocks into frame rails though access holes as shown. Leave pull wires attached. Note: It is
much easier if bolt and spacer are not engaged while inserting them into frame, refer to illustration.
Tighten all M10 CL9.8 fasteners with torque wrench to 53 Lb.-Ft (72 N*M)
4.
Feed the pull wires through the slot on the hitch brackets.
5.
Install 3/8-16 x 2” carriage bolt (Item 6) thru square hole in bracket. As shown.
6.
Raise hitch into position, aligning holes in hitch with the existing weldnuts in vehicle frame rails. Attach hanger brackets. Install fasteners
(Item 1) as shown.
7.
Remove pull wires and attach (Item 4 & 5) (be careful not to push fastener back into frame rail).
8.
Torque all fasteners (Items 1 – 5) to specifications shown below
9.
Slide rubber hanger onto 3/8” carriage bolt and secure with flanged locknut. Tighten nut against rubber hanger allowing hanger to rotate –
DO NOT OVER TIGHTEN.
Tighten all 3/8 GR5 fasteners with torque wrench to 31 Lb.-Ft (41 N*M)
Tighten all 7/16 GR5 fasteners with torque wrench to 50 Lb.-Ft (68 N*M)
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
Form F206 Rev A 5605
z
2010 Cequent Performance Products
Sheet 1 of 3
36502N
4-27-10
Rev. A