6.3.1

Internal Front Access AC Load Center option

The internal AC load center is not included when there is an external AC panel.

The internal AC load center is fed from the front access terminal block 120V connection, distributing power to
auxiliary equipment; such as, air conditioner and GFCI convenience outlet via two (2) 15A single pole breakers .
This is located in the power equipment compartment in the front upper right corner.

6.3.2

External AC Load Center – 65KAIC option (22KAIC similar)

Figure 12–External AC load center, door open

Primary (utility power supply) and secondary
(generator power supply) disconnects

Automatic transfer switch
(ATS) keypad

“Deadfront” cover

30-position load center

NOTE: A separate manual for the external AC load center will

be provided in the system documentation package.

Procedure:

1.

Locate the external AC load center on the left side of the enclosure.
Open door (Figure 12) and then loosen screws to open deadfront cover
and expose internal equipment (Figure 13).

2.

Using a Greenlee hydraulic punch driver (or similar tool) create an
appropriate-sized knockout on the box to accept the power conduit and
wire cables.

3.

Install conduit and necessary fittings.

4.

Feed wire cables through conduit leaving enough length to reach main
disconnect breaker.

Figure 13–External AC load center,

door open and cover removed

ATS

See next set of
figures for more
details

Automatic transfer switch (ATS) control box