6 enclosure compartment (a.k.a. chamber) integrity – Alpha Technologies Te41, 24V User Manual
Page 21
Argus Technologies Ltd.
057-102-C0 Rev B WC
Printed in Canada. © 2009 Argus Technologies Ltd. ARGUS and CORDEX are trademarks of Argus Technologies Ltd. All Rights Reserved.
Page 9 of 26
Install “Nokia interface” type gasket
around conduit openings
Move enclosures to mounting
locations and loosely install base
mounting bolts
Install chase nipple in conduit
knockout locations shown here
Figure 8–Gasket on lower side panel and inside view of conduit openings
Knockout enclosure to
enclosure mounting holes
Install hardware to bolt
enclosures together in top two
corners
Tighten all bolts
Figure 9–Enclosure to enclosure mounting hole (typical)
5.6
Enclosure Compartment (a.k.a. Chamber) Integrity
The Te41 enclosure top compartment typically runs hot and is fan cooled; while the bottom is air conditioned.
The Te40 enclosure compartment is air conditioned.
Maintain the integrity of the compartment(s) with gasketing, boots, and other sealing materials. Minimize the air
exchange between compartments and enclosures to reduce air conditioner loading.
Also maintain water intrusion integrity by similar means; for example, the drawings provided (with the system
documentation package) for the top hat kit illustrate the customer cable fittings.