beautypg.com

Alpha Technologies Te41, 24V User Manual

Page 17

background image

Argus Technologies Ltd.

057-102-C0 Rev B WC

Printed in Canada. © 2009 Argus Technologies Ltd. ARGUS and CORDEX are trademarks of Argus Technologies Ltd. All Rights Reserved.

Page 5 of 26

3.5

External AC Load Center

The optional external AC load center will come complete with its own manual (included with the system
documentation package).

3.6

Equipment Folding Table

An optional equipment folding table can be added to the system on the inside of the battery/customer equipment
compartment door.

Figure 5–Equipment folding table

3.7

Cable Bridge Interface

An optional cable bridge interface installation kit can be mounted on either the left or right side near the top of the
enclosure. This kit must be installed prior to installing the adjacent enclosure. See enclosed drawings for interface
kit assembly.

Figure 6–Cable bridge interface kit installed on the Te41

(Photo is for reference only – subject to installation requirements)