4 battery connection, Battery connection – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual
Page 27
![background image](/manuals/295708/27/background.png)
3.8.4 Battery connection
S
G
T5
000
_05
0-08
0_UP
S
co
nne
ct
ion
battery_02
US
X3
+
PE
BATTERY
_
Fig. 3.8.4-1 Power connections battery
SG Series 50 & 80kVA Max.
rating
Battery terminals:
4/0 AWG (95mm
2
)
Battery
+
–
Positive pole of the Battery
Negative pole of the Battery
Do not insert the Battery Fuses before the commissioning.
Battery cable terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.
NOTE !
To meet standards concerning electromagnetic compliance, the connection
between the UPS and external battery must be done by using a shielded cable or
suitable shielded (metal) conduit!
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer for, the secondary of the
transformer must be wye-configured with neutral solidly grounded.
Modifications reserved
Page 27/38
OPM_SGS_ISG_50K_80K_0US_V040.doc
Installation Guide SG Series 50 & 80 kVA