Remove existing iron core neutral ct assembly, Neutral ct assembly in cable/bus compartment – GE Industrial Solutions EntelliGuard R AKD-5 User Manual
Page 40

39
EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual DEH-41547 02/12
Remove Existing Iron Core Neutral CT Assembly
• It must be ensured that the supply power
to the compartment is turned off/
compartment is de-energized for all the
incoming and outgoing circuits of the LVS
prior to any work being conducted on it.
• During the installation and related work on
the equipment, it must be ensured that the
operator is using the prescribed PPE for the
specified tasks.
• Ensure only qualified personnel install, operate, service, and maintain all electrical
equipment.
Figure 53
shows a photo of an existing iron core neutral current transformer.
Figure 53. Iron Core Neutral CT
Neutral CT assembly in Cable/Bus Compartment:
1. Verify that the LVS has been de-energized and the breaker in the compartment being retrofitted
are switched off and removed from the LVS.
2. Open the door on the rear of the compartment to gain access the cable/bus compartment of
the LVS.
The existing neutral CT assemblies are usually mounted vertically on two copper bus bars
placed horizontally.