Setup examples - master control – TC Electronic LM2 User Manual
Page 42

SETUP ExAMPLES - MASTER CONTROL
42
Fig 7
Meter with logging of platform output at Master Control.
Open the Icon application for a detailed Radar view covering the past 24 hours.
Connect a computer once per week to dump logging file.
Use a preset from the Meter bank.
Fig 8
Meter, logging and precision limiting for platform output at Master Control.
Open the Icon application for a detailed Radar view covering the past 24 hours.
Connect a computer once per week to dump logging file.
Use a preset from the True-peak Limit bank.