beautypg.com

Gembird SIS-PMS-LAN User Manual

Page 18

background image

18

SIS-PMS-LAN PROGRAMMABLE SURGE

PROTECTOR WITH LAN INTERFACE

All brands and logos are registered trademarks of their respective owners

After a successful login you will face the Socket 1 Status page (see

section 4.2 below).

NOTE: There is a possibility that you might then need to open the

LAN settings page (see section 4.3 below) to complete the IP
configuration.

4.2. Socket page

There are 4 manageable sockets on SIS-PMS-LAN and so there are

4 pages corresponding to them. On each status page you can see the
status of the socket (on or off) and you have the Switch On (Switch Off)
button. Besides you can see the scheduled events for this socket.

The socket shown on the Figure #6 is currently off, it will be turned

on automatically on the 27th of June at 9:59 and on the 28th of June at
10:59 it will be switched off again. The shown two events will be executed
periodically, with a loop period of 2 days.