beautypg.com

Wayne-Dalton 9800 User Manual

Page 19

background image

Tools Needed:

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.

To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at

www.wayne-dalton.com

19

Top Section

Place the top section in the opening
and vertically align with lower sections.
align vertical marks in the upper
alignment sticker, with the lower
alignment sticker on right hand side on
the back of door. Temporarily secure
the top section by driving a nail in the
header near the center of the door and
bending it over the top section. Now
flip up hinge leafs, hold tight against
section, and fasten center hinges
first, and end hinges last. (Refer to
step 9). When installing a door with a
Torsion counterbalance system, vertical
track alignment is critical. Position
flagangle between 1-11/16” (43 mm)
to 1-3/4” (44 mm) from the edge of
the door; tighten the bottom lag screw.
Flagangles must be parallel to the door
sections. Repeat for opposite side.

IMPORTANT: ThE DIMENsION
bETWEEN ThE FlaGaNGlEs MusT bE
DOORWIDTh Plus 3-3/8” (86MM) TO
3-1/2” (89 MM) FOR sMOOTh, saFE
DOOR OPERaTION.

for quick install track:

Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Repeat for opposite side.

for fully adjustable track:

Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Push the vertical track against the
rollers so that the rollers are touching
the deepest part of the curved side of
the track (see illustration); tighten all
the track bolts and nuts. Repeat for
oppisite side.

12

hammer

DOOR WIDTh

+3-3/8” TO 3-1/2”

Fully aDjusTablE

1-11/16” TO 1-3/4”

FlaGaNGlE

TOP

sECTION

NaIl

ROllER

VERTICal TRaCk

ROllER aGaINsT
VERTICal TRaCk

TOP sECTION

INST

ALLA

TION

32

79

85

N

EW

9

-0

4-

06

32

79

85

N

EW

9

-0

4-

06

alIGNMENT sTICkERs