Tools Needed:

Tools Needed:

Bottom Section

before installing the bottom section,
the weather seal (may not be included)
must be installed (see PREPaRING ThE
OPENING on page 10)

Center the bottom section in the door
opening. level section using wooden
shims (if necessary) under the bottom
section.

level

7

bOTTOM
sECTION

DOOR OPENING

WEaThER sEal

WOODEN shIMs

(IF NECEssaRy)

lEVEl

Vertical Track

IMPORTANT: ThE TOPs OF ThE
VERTICal TRaCks MusT bE lEVEl
FROM sIDE TO sIDE. IF ThE bOTTOM
sECTION Was shIMMED TO lEVEl IT.
ThE VERTICal TRaCk ON ThE shIMMED
sIDE, MusT bE RaIsED ThE hEIGhT OF
ThE shIM.

Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers
and the door jamb. Drill 3/16” pilot
holes for the lag screws. loosely fasten
jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain 5/8”
spacing. Repeat for the right hand side.

bOTTOM
sECTION

bOTTOM sECTION

VERITCal TRaCk

ROllER

5/16” x 1-5/8”

laG sCREWs

FlaGaNGlE

VERTICal

TRaCk

assEMbly

jaMb

bRaCkET

3/16” Drill bit

Power Drill

7/16” socket

Driver

Tape Measure

level

Vice Grips (Pair)

5/8”

8