beautypg.com

Wayne-Dalton 8000 SERIES 46 User Manual

Page 18

background image

18

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

12

11

vertical Track

Stacking Sections

3/16” Drill Bit

Power Drill

7/16” Socket

Driver

Tape Measure

Level

Power Drill

7/16” Socket

Driver

BOTTOM SECTION

5/16 x 2” hEx

hEAD LAG

SCREWS

fLAGANGLE

VERTICAL

TRACk

ASSEMBLy

jAMB

BRACkET

VERTICAL TRACk

ROLLER

jAMB BRACkET

5/16” x 2”

hEx hEAD

LAG SCREW

fLAGANGLE hOLE

SELECTION

LOCk SECTION

NOTE: for door section identification
see page 4.

NOTE: Make sure hinges are flipped
down, when stacking another section
on top.

With assistance, lift second section and
guide rollers into the vertical tracks.
keeping the ends of the sections
aligned, install remaining section(s),
except top section, in same manner.
Now flip up hinge leaf, and fastening
center hinges first, and end hinges last,
using (2) 1/4”- 14 x 5/8” self tapping
screws. Repeat for other section(s)
except top section.

NOTE: Install lock at this time (sold
separately) See instructions in
OPTIONAL SIDELOCk INSTALLATION on
page 33.

IMPORTANT: ThE TOPS Of ThE VERTICAL

TRACkS MuST BE LEVEL fROM SIDE

TO SIDE. If ThE BOTTOM SECTION WAS

ShIMMED TO LEVEL IT, ThE VERTICAL

TRACk ON ThE ShIMMED SIDE, MuST BE

RAISED ThE hEIGhT Of ThE ShIM.

Position the left hand vertical track

assembly over the rollers of the bottom

section. Make sure the counterbalance

cable is located between the rollers and

the door jamb. Drill 3/16” pilot holes for the

lag screws.

If installing an idrive

®

opener: Raise the

track so that the bottom of the track is 1”

higher than the bottom of the door.

For non-idrive

®

operated garage doors:

Install the track so that it is aligned with

the bottom of the door.

Loosely fasten jamb brackets and flagangle

to the jamb using 5/16” x 1-5/8” hex head

lag screws. Tighten bottom jamb bracket

lag screw securely to the jamb to maintain

5/8” spacing. hang cable drum over

flagangle. Repeat for the right side.

5/8”