Jksss+ series 2.3 - 4.2kv, Jksss+ series – Toshiba VF010H05 User Manual
Page 5
JKSSS+ Series - 105
JKSSS+ Series
2.3 - 4.2KV
JKSSS+ Series
Medium Voltage Solid
State Soft Starters
2.3 - 4.2KV
Installation &
Operation Manual
Chapter 1: Introduction ..................................................................................................... 1
1.1 Overview
1.2 Specifi cations
1.3 Design
Features
1.4
Structure and Power Bus
1.5
Theory of Operation
1.6 General
Protection
1.7
Thermal Overload Protection
1.8 Firing
Circuit
1.9 Electronics
Chapter 2: Installation ..................................................................................................... 12
2.1
Receiving and Unpacking
2.2
Initial Unit Inspection
2.3 Location
2.4 Dimensions
2.5 Mounting
2.6 Additional
Equipment
2.7 Before
Applying
Power
2.8 Warnings
2.9
Medium Voltage Power Connections
2.10
Control Connections and JKSSS+-TCB
2.11
Reference
Section
Chapter 3: Start-Up ........................................................................................................ 29
3.1
Preliminary Start-up Check List
3.2 Introduction
3.3 Acceleration
Adjustments
3.4 Deceleration
Adjustments
3.5
Sequence of Normal Operation
3.6
Emergency Bypass Operation
Chapter 4: Programming ................................................................................................ 33
4.1 Keypad/Operator
Interface
4.2 Menu
Navigation
Chapter 5: Setpoint and Programming ........................................................................... 36
5 .1
Setpoints Page List
5.2 Setpoint
Menu
SP.1 Basic Confi guration .................................................................................................46
SP.2 Starter Confi guration ...............................................................................................47
SP.3 Phase & Ground Settings .......................................................................................50
SP.4 Relay Assignment ...................................................................................................53
SP.5 Relay Confi guration ...............................................................................................55
SP.6 I/O Confi guration ....................................................................................................56
SP.7 Custom Acceleration Curve ...................................................................................59
SP.8 Overload Curve Confi guration ...............................................................................62
SP.9 RTD Confi guration .................................................................................................63
SP.10 Set Password ........................................................................................................65
SP.11 Communications ...................................................................................................66
SP.12 System Setpoints ..................................................................................................67
SP.13 Calibration & Service ............................................................................................69
Chapter 6: Metering Pages .............................................................................................. 70
6 .1
Metering Page List
Chapter 7: Maintenance and Troubleshooting/Disposal/Storage ............................... 80
7.1 Failure
Analysis
7.2
Typical Block Diagram
7.3
Overload Curve Defi nition
7.4
Typical Wiring Diagram for TCB Board
7.5
Typical Internal Wiring Diagram
7.6
Spare Parts List
7.7
Instructions for Stack Replacement
7.8
Instructions for Low Voltage Test
7.9
Maintenance Program/Servicing Equipment/Disposal/Storage
Warranty and Limitations of Liability ............................................................................. 99