beautypg.com

Outdoor installation – Raypak MVB 5042004 User Manual

Page 29

background image

29

** Subtract 10 ft per elbow. Max. 4 elbows.

t Adapters supplied by others.

Table N: Category III Horizontal Vent & Horizontal Direct Vent

See Table L for Category I venting guidelines.

It is recommended that the intake vent be insulated in

colder climates.

Termination

The flue terminal should be vertical and should termi-

nate outside the building at least 2 ft above the highest

point of the roof within 10 ft. The vent cap should have

Fig. 28: Direct Vent - Vertical

a minimum clearance of 4 ft horizontally from and in no

case above or below (unless a 4 ft horizontal distance

is maintained) electric meters, gas meters, regulators

and relief equipment. The distance of the vent terminal

from adjacent public walkways, adjacent buildings,

open windows and building openings must be consis-

tent with the NFGC (U.S.) or B149 (Canada).

Flues supported only by flashing and extended above

the roof more than 5 ft should be securely guyed or

braced to withstand snow and wind loads.

The air inlet opening MUST be installed 1 ft above the

roof line or above normal snow levels that might ob-

struct combustion air flow. This dimension is critical to

the correct operation of the heater and venting system

and reduces the chance of blockage from snow. The

vent cap must have a minimum 3 ft vertical clearance

from the air inlet opening.

Outdoor Installation

Outdoor models must be vented with listed vent mate-

rial per the following instructions and installed with the

optional factory-supplied outdoor vent kit. A special

vent cap and air intake hood are provided in accor-

dance with CSA requirements. These must be

installed as illustrated in Fig. 29.

Care must be taken when locating the heater out-

doors, because the flue gases discharged from the

Model

No.

Certified

Vent

Material

Vent

Size

(in.)

Maximum

Horizontal

Vent Length

(ft)**

Combustion Air

Intake Pipe

Material

Air Inlet

Max. Length** (ft)

6” Ш

8” Ш

10” Ш

504

Category III

8

75

Galvanized Steel,

PVC,

ABS,

CPVC

45

100

t

754

10

1104

10

1504

12

45

85

t

2004

14

CAUTION: This venting system requires the

installation of a condensate drain in the vent piping

per the vent manufacturer’s instructions. Failure to

install a condensate drain in the venting system will

void all warranties on this heater.

WARNING: No substitutions of flue pipe or vent

cap material are allowed. Such substitutions would

jeopardize the safety and health of inhabitants.