beautypg.com

Site requirements, Operator and service access, Floor requirements – Kodak PROFESSIONAL LED II 20P User Manual

Page 124

background image

Specifications

B-2

September 2000

Site Requirements

Operator and Service Access

When fully assembled the equipment requires a minimum of 91 cm
(36 in.) on each side to allow sufficient access for normal operator maintenance
and for service.

Floor Requirements

The equipment should be installed on a smooth, hard, and level floor surface.
Carpet is not recommended.

The floor pitch should not exceed 1 inch in 5 feet.

Printer

Processor

4.4 meters (174 in.)

2.9 meters

(114 in.)

15A

30A

1.5 meters (60 in.)

.91 meters (36 in.)

minimum

.91 meters (36 in.)

.91 meters (36 in.)

.91 meters (36 in.)

minimum

minimum

minimum

3.5 meters + .3 meters (138 in. + 12 in.)

2.2 meters + .3 meters (86 in. + 12 in.)

_

_

_

_

*

*

SCSI-2 connection from host here

4.5 meters (179 in.)