beautypg.com

To power off the server – Sun Microsystems FASTETHERNET 6U User Manual

Page 54

background image

36

Sun Quad FastEthernet 6U CompactPCI Adapter Installation and User’s Guide • June 2000

Installing the Front-Access Adapter in
Cold-Swap Mode

Note –

When installing the adapter in a server in cold-swap mode, you must consult

the documentation that shipped with the server. The server’s documentation
describes the specific software commands required to power off and power on the
server.

Installing the front-access adapter in cold-swap mode involves the following
procedures:

“To Power Off the Server” on page 36

“To Install the Front-Access Adapter in Cold-Swap Mode” on page 37

“To Power On the Server” on page 38

Caution –

Do not use excessive force when installing the adapter into the

CompactPCI slot. You may damage the adapter’s connector or the pins on the
midplane, causing permanent damage to the adapter or to the system. If the adapter
does not seat properly when you apply even pressure, remove the adapter and
carefully reinstall it.

To Power Off the Server

This procedure describes a general overview of powering off the server. Refer to
your system’s documentation for the exact procedure.

1. Before shutting down the operating environment and halting the system, ensure

that all significant application activity on the server has stopped.

2. Follow the appropriate procedures, as documented in the system’s service manual,

to shut down and halt the system.

Refer to the system’s documentation for the complete power off procedure.

For example, if you were installing the adapter in a Netra ct server, you would refer
to the Netra ct Server Service Manual. The service manual contains the hardware and
software powering off procedures.